Project List Full Screen
7 Comment(s)
Click on person's name below to see comment on map
Jim
1 year 6 months ago

Upgrade
Downgrade
SR 542 FROM 1ST STREET SOUTH TO US 27
Dundee road widening is overdue.
Response from Xiomara @ Polk TPO
Here's some additional info on the project: The proposed SR 542 will be a four lane urban typical section. This typical consists of two 11-ft lanes, a 7 ft. bike lane, 2-ft sod strip, and a 5-ft sidewalk in both directions. The median width is 22-ft for the majority of the project with wider medians in areas where dual left-turn lanes are to be constructed. The proposed drainage will be collected in a closed drainage system and will be treated in ponds that will be acquired as part of the design process. The signals at all signalized intersections will be replaced. Lighting and landscaping will be placed along the corridor. Letting Date: October 2020 Estimated Construction Cost: $39.5 million
1 year 6 months ago

Upgrade
Downgrade
This has been a failing intersection for years. Why is there no plan for this intersection.
Respond
1 year 6 months ago

Upgrade
Downgrade
Cypress Gardens Blvd. is overly crowded. There needs to be a traffic study to learn of alternate routes to relieve this road of traffic.
Response from Xiomara @ Polk TPO
Hi Edward! FDOT is conducting a traffic flow alternatives study for this section of Cypress Gardens Blvd. We should have the report in a week or so. Would you like to receive a copy?
Respond
1 year 5 months ago

Upgrade
Downgrade
US 27 AT SR 60
People often stop on existing off-ramp from Eastbound 60 to Southbound 27 adjacent to the Sonoco to check for oncoming traffic moving Southbound on 27 rather than using the full merge lane on 27 at that off-ramp to get onto 27 Southbound. This usually backs up traffic on the off-ramp significantly during peak traffic. Hopefully the signalization of this intersection will help alleviate this issue but I do suggest signage on the off-ramp to encourage drivers not to stop on the ramp.
Respond
1 year 5 months ago

Upgrade
Downgrade
US 27 AT SR 60
I travel from this route twice a day and have seen the ramp backed up more than a car or two, probably twice in the last year. 292 million dollars?? What a complete waste of taxpayer money. We can afford nonsense like this but must take more and more money away from schools every year? I don't get it.
Respond
1 year 5 months ago

Upgrade
Downgrade
US 27 AT SR 60
I travel from this route twice a day and have seen the ramp backed up more than a car or two, probably twice in the last year. 292 million dollars?? What a complete waste of taxpayer money. We can afford nonsense like this but must take more and more money away from schools every year? I don't get it.
Respond
1 year 5 months ago

Upgrade
Downgrade
US 27 AT SR 60
We need or have 60 east widened to 4 lanes and lights installed. This section has had numerous accidents most with fatalities.
Respond