Home   
St Lucie TIP 2018

Click on the map to change the street view. Street View may not appear if not available through Google Maps.

Project ID: 4352451
ATMS - ARTERIAL TRAFFIC MGMT
SIS
Lead Agency: MANAGED BY FDOT
Length: 21.767

Extra Description:

2015 TPO PRIORITY #4 SR-5/US-1 FROM SAVANA CLUB BLVD. TO SR-713/KINGS HWY SR-70 FROM SR-713/KINGS HWY TO SR-5/US-1

Phase Group: PRELIMINARY ENGINEERING, RAILROAD & UTILITIES, ENVIRONMENTAL, DESIGN BUILD


Contract Class: 9

Item Segment: 1

SIS: Yes

Component Group: HIGHWAYS

Related Key: 4352451

LRTP: Page 6-2

Responsible Agency



Agency: MANAGED BY FDOT
Type of Work: 761

Funding

PhaseFund Code20192020202120222023Total
PEDS197,5000000 197,500
ENVDDR08,000000 8,000
DSBDDR05,925,883000 5,925,883
DSBDIH052,750000 52,750
DSBDS04,787,491000 4,787,491
197,50010,774,124Total: 10,971,624

Prior Year Cost: 245,286

Future Year Cost: 0

Total Project Cost: 11,216,910

LRTP: Page 6-2
Print (Portrait) Print (Landscape)
© 2019 PlaceVision Inc | Help | Privacy