Commenting is now closed.
Coordinates: 27.37426858, -80.33705459
Project ID: 2314402
ADD LANES & RECONSTRUCT
Non-SIS
Lead Agency: MANAGED BY FDOT
From: S. 25TH STREET/SR-615
To: SR-5/US-1
Length: 1.803

Extra Description:

WIDEN 2 LANES TO 4 LANES/10MPO PRIORITY# 1 REPLACE EXISTING BRIDGE,ADA RAMPS AT 3 SIGNALIZED INTERSEC CONSTRUCT 5feet SIDEWALKS,LANDSCAPING,LIGHTING,BRICK PAVERS, DRAINAGE,4 BIKE LANE ON ROADWAY/PD&E BY COUNTY=SEG#1 LFA WITH COUNTY FOR PHASE 4B $246,723=LFF PH 4B (SEE IC) R/W FUNDED/SAFETEA-LU EARMARK HPP 610 (FOR C2 DESC SEE SC)

Phase Group: PRELIMINARY ENGINEERING, CONTRACT INCENTIVES, RAILROAD & UTILITIES, CONSTRUCTION, ENVIRONMENTAL, RIGHT OF WAY

Contract Class: 1

Item Segment: 2

SIS: No

Component Group: HIGHWAYS

Related Key: 2314401

LRTP: Page 6-5

Responsible Agency

Agency: MANAGED BY FDOT

Type of Work: 213

Funding

PhaseFund Code20192020202120222023Total
ROWSA993,85327,117000 1,020,970
ROWSU354,0000000 354,000
1,347,85327,117Total: 1,374,970

Prior Year Cost: 73,023,786

Future Year Cost: 0

Total Project Cost: 85,012,162

LRTP: Page 6-5
Print (Portrait) Print (Landscape)
© 2019 PlaceVision Inc | Help | Privacy